How it works Concept Notes Diagnostic Free Practice Sectional Tests Pricing Log in to Pro Get Pro — ₹999 →

Work & Rate — Practice Set

Bank code: WRD-WRK 30 questions

Bank code: WRD-WRK · Section: Word Problems · 30 questions — Easy 5 · Medium 9 · Hard 16

Rates add, times don't - set the job to the LCM of the individual times and every fraction disappears.

Every question below is live in the question bank under the ID shown — the sheet and the portal are the same questions. Attempt a level with the clock running, then check Part C.


Part A — Questions

Quantitative Comparison — the four choices are always the same, so they are not reprinted: (A) Quantity A is greater · (B) Quantity B is greater · (C) The two quantities are equal · (D) The relationship cannot be determined from the information given

Level 1 · Easy — 5 questions · ~4 min

warm-up — these must be automatic

Q1 · WRD-WRK-001 · MCQ · 45s

Machine A can complete a job in 6 hours. Machine B can complete the same job in 4 hours. Working together at their constant rates, how long do the two machines take to complete the job?

(A) 25 minutes
(B) 2 hours 24 minutes
(C) 4 hours
(D) 5 hours
(E) 10 hours

Q2 · WRD-WRK-005 · MCQ · 50s

A pipe fills an empty cistern in 4 hours. A drain empties a full cistern in 12 hours. If both are opened at the same time on an empty cistern, how many hours does the cistern take to fill?

(A) 3 hours
(B) 4 hours
(C) 6 hours
(D) 8 hours
(E) 16 hours

Q3 · WRD-WRK-003 · Numeric Entry · 40s

Pump A fills a tank in 12 hours. Pump B fills the same tank in 6 hours. Working together, how many hours do they take to fill the tank?

Numeric entry — write the number.

Q4 · WRD-WRK-014 · Numeric Entry · 55s

Two printers working together print a report in 4 hours. Printer A alone takes 12 hours. How many hours does Printer B alone take?

Numeric entry — write the number.

Q5 · WRD-WRK-007 · QC · 50s

Worker A can complete a job in 10 hours and Worker B can complete the same job in 15 hours. Both work at constant rates.

Quantity A: The number of hours A and B take to complete the job working together Quantity B: 6 hours


Level 2 · Medium — 9 questions · ~13 min

two or three steps, one planted trap each

Q6 · WRD-WRK-016 · MCQ · 75s

Worker A can finish a project in 9 hours and Worker B can finish it in 6 hours. A starts alone and works for 3 hours, then B joins and they work together until the project is done. How many hours after B joins is the project complete?

(A) 2 hours
(B) 2 hours 24 minutes
(C) 3 hours
(D) 3 hours 36 minutes
(E) 6 hours

Q7 · WRD-WRK-026 · MCQ · 80s

Worker A can write a report in 10 hours. Worker B takes 40 percent longer than A to write the same report. Working together at constant rates, how long do they take?

(A) 5 hours 50 minutes
(B) 6 hours
(C) 7 hours 9 minutes
(D) 8 hours 24 minutes
(E) 12 hours

Q8 · WRD-WRK-034 · MCQ · 80s

A contractor hires 10 workers, all working at the same constant rate, to finish a building in 20 days. After 5 days, 4 of the workers leave. How many additional days do the remaining workers need to finish the building?

(A) 15 days
(B) 20 days
(C) 25 days
(D) 30 days
(E) 35 days

Q9 · WRD-WRK-023 · Numeric Entry · 75s

Three friends working together clean a house in 3 hours. The first friend alone would take 6 hours and the second alone would take 9 hours. How many hours would the third friend take alone?

Numeric entry — write the number.

Q10 · WRD-WRK-025 · QC · 80s

n > 0. Worker A works at a constant rate of 1/n of a job per hour and Worker B works at a constant rate of 1/(2n) of the same job per hour.

Quantity A: The number of hours A and B take to complete the job working together Quantity B: 2n/3 hours

Q11 · WRD-WRK-031 · QC · 90s

Worker A alone takes 8 hours and Worker B alone takes 12 hours to finish a job. They start together, but A stops working exactly 2 hours before the job is finished; B works from the start until the job is done.

Quantity A: The total number of hours from the start until the job is finished Quantity B: 6 hours

Q12 · WRD-WRK-021 · Select all that apply · 90s

Worker A alone takes 12 hours and Worker B alone takes 8 hours to complete a task. They work together at their constant rates. Select all that apply.

(A) Together they complete the task in less than 4 hours.
(B) Working at 5/24 of the task per hour, together they complete it in exactly 4 hours 48 minutes.
(C) If Worker A works alone for the first 3 hours and Worker B then joins, the task is finished 6 hours 36 minutes after Worker A started.
(D) Worker B contributes more of the finished task than Worker A does.
(E) In one hour of working together, Worker A completes 3/24 of the task.

Q13 · WRD-WRK-028 · Select all that apply · 90s

Pipe A alone fills an empty tank in 9 hours. Pipe B alone empties a full tank in 18 hours. Both pipes are opened at the same time on an empty tank. Select all that apply.

(A) Together the two pipes raise the water level by 1/18 of the tank each hour.
(B) The tank is full exactly 18 hours after both pipes are opened.
(C) After 6 hours the tank is 2/3 full.
(D) If pipe B were kept closed for the first 3 hours and opened only after that, the tank would be full 3 hours sooner than it is now.
(E) If pipe B instead emptied a full tank in 6 hours, the tank would fill in 54 hours.

Q14 · WRD-WRK-055 · Numeric Entry · 115s

A project requires exactly 120 worker-hours. On day 1 one worker works an 8-hour shift. On each subsequent day one more worker is added, so day 2 has 2 workers, day 3 has 3 workers, and so on, every worker putting in an 8-hour shift each day. All workers work at the same constant rate. On which day is the project first completed?

Numeric entry — write the number.


Level 3 · Hard — 16 questions · ~27 min

where 162+ is won or lost

Q15 · WRD-WRK-020 · MCQ · 100s

Working alone at a constant rate, Ana can paint a certain room in 6 hours. Working alone at a constant rate, Ben can paint the same room in 4 hours. They begin painting the room together, but Ben stops for a 1-hour break while Ana keeps painting, and then Ben resumes. How many hours after they begin is the room completely painted?

(A) 2.4
(B) 3
(C) 3.4
(D) 4
(E) 5

Q16 · WRD-WRK-037 · MCQ · 105s

A water tank is 3/4 full. An inlet pipe adds 1/8 of the tank per hour and a drain removes 1/24 of the tank per hour. Both run for 2 hours, and then the drain is closed while the inlet keeps running. How long does the tank take to become completely full, measured from the moment both were opened?

(A) 2 hours
(B) 2 hours 40 minutes
(C) 3 hours
(D) 3 hours 20 minutes
(E) 6 hours

Q17 · WRD-WRK-042 · MCQ · 95s

Worker A works 3 times as fast as Worker B, and Worker B works 2 times as fast as Worker C. Working all together at their constant rates, the three complete a job in 4 hours. How long would Workers A and B take to complete the same job working together without C?

(A) 3 hours 33 minutes
(B) 4 hours 30 minutes
(C) 6 hours
(D) 7 hours 12 minutes
(E) 9 hours

Q18 · WRD-WRK-045 · MCQ · 100s

Workers A, B and C work at constant rates of 1/4, 1/6 and 1/12 of a job per hour respectively. All three start together. C leaves after 1 hour and B leaves 1 hour after that, 2 hours from the start. How many more minutes does A need, working alone, to finish the job?

(A) 10 minutes
(B) 15 minutes
(C) 20 minutes
(D) 30 minutes
(E) 40 minutes

Q19 · WRD-WRK-047 · MCQ · 100s

A certain job requires a total of 60 machine-hours, and it can be shared equally among any number of identical machines working at the same constant rate. With n machines the job takes 5 hours less than it takes with n - 1 machines. What is the value of n?

(A) 3
(B) 4
(C) 5
(D) 6
(E) 12

Q20 · WRD-WRK-048 · QC · 100s

Workers A and B, each working at a constant rate, together finish a job in 6 hours. Working alone, A would take a hours and B would take b hours, where 0 < a < b.

Quantity A: b - a Quantity B: 5

Q21 · WRD-WRK-052 · QC · 90s

Pipe A alone fills an empty pool in 3 hours. Pipe B alone empties a full pool in 5 hours. Both are opened on an empty pool at time zero and both stay open. The pool cannot hold more than its full volume; any excess water simply overflows and is lost.

Quantity A: The fraction of the pool that is filled 14 hours after the pipes are opened Quantity B: 1

Q22 · WRD-WRK-041 · Numeric Entry · 105s

Pipe A alone fills an empty tank in 9 hours and pipe B alone fills it in 18 hours. Pipe C alone empties a full tank in 8 hours. Pipes A and B are open from the start; after 3 hours pipe C is also opened and all three stay open until the tank is full. How many hours in total, from the start, does the tank take to fill?

Numeric entry — write the number.

Q23 · WRD-WRK-049 · Numeric Entry · 95s

Worker A alone would finish a job in a hours and Worker B alone would finish it in b hours, each working at a constant rate. Together they finish the job in 4 hours, and a + b = 18. What is the value of ab?

Numeric entry — write the number.

Q24 · WRD-WRK-053 · Numeric Entry · 100s

Worker A completes 1/n of a job per hour and Worker B completes 1/(n + 6) of the same job per hour, where n is a positive integer. Working together they complete the job in exactly 4 hours. What is the value of n?

Numeric entry — write the number.

Q25 · WRD-WRK-046 · Select all that apply · 100s

Workers A and B work at constant rates. Together they complete a job in T hours, and Worker A alone would complete the same job in 2T hours. Which of the following must be true? Select all that apply.

(A) Worker B alone would complete the job in 2T hours.
(B) If Worker A works alone for the first T hours and Worker B then finishes the job alone, the job is done exactly 2T hours after the start.
(C) Worker B's individual rate is greater than Worker A's individual rate.
(D) The combined rate equals twice Worker A's individual rate.
(E) If a third worker whose rate equals Worker A's joined the pair, the three would finish the job in T/2 hours.

Q26 · WRD-WRK-051 · Select all that apply · 105s

Worker A alone takes 20 hours and Worker B alone takes 30 hours to finish a job. They start together at time zero and work together at their constant rates until the job is done. Which of the following statements are true? Select all that apply.

(A) Exactly 1/3 of the job remains after 8 hours.
(B) Less than 1/4 of the job remains after 9 hours.
(C) The job is exactly half finished after 6 hours.
(D) More than 3/4 of the job is finished after 10 hours.
(E) The job is finished before 11 hours have passed.

Q27 · WRD-WRK-054 · MCQ · 110s

Workers A, B and C take turns on a job in a repeating three-day cycle: A works alone on day 1, B alone on day 2, C alone on day 3, A alone on day 4, and so on. Their individual rates are 1/10, 1/15 and 1/30 of the job per day. Starting from day 1, on which day is the job first completed?

(A) Day 10
(B) Day 13
(C) Day 14
(D) Day 15
(E) Day 16

Q28 · WRD-WRK-057 · MCQ · 105s

Working together at their constant rates, machines A and B complete a certain job in 6 hours. If machine A worked at twice its rate and machine B's rate did not change, the two machines together would complete the job in 4.5 hours. How many hours does machine A take to complete the job working alone at its usual rate?

(A) 9
(B) 10.5
(C) 12
(D) 18
(E) 36

Q29 · WRD-WRK-059 · Select all that apply · 105s

Working alone at its constant rate, pump A fills an empty tank in 3 hours. Working alone at its constant rate, pump B fills the same tank in 6 hours. Both pumps are turned on at the same time to fill the empty tank. Pump A runs until the tank is full, and pump B may be turned off at any time, including immediately. Which of the following could be the number of hours it takes to fill the tank?

Indicate all such values.

(A) 1.5
(B) 2
(C) 2.5
(D) 3
(E) 3.6

Q30 · WRD-WRK-060 · QC · 120s

Each machine of type X works at one constant rate and each machine of type Y works at another constant rate. Three X machines and five Y machines, working together, complete a job in 8 hours. Five X machines and three Y machines, working together, complete the same job in 6 hours.

Quantity A: The number of hours four X machines and four Y machines, working together, take to complete the job Quantity B: 7


Part B — Answer Key

Q ID Level Type Answer
1 WRD-WRK-001 easy MCQ B
2 WRD-WRK-005 easy MCQ C
3 WRD-WRK-003 easy Numeric Entry 4
4 WRD-WRK-014 easy Numeric Entry 6
5 WRD-WRK-007 easy QC C
6 WRD-WRK-016 medium MCQ B
7 WRD-WRK-026 medium MCQ A
8 WRD-WRK-034 medium MCQ C
9 WRD-WRK-023 medium Numeric Entry 18
10 WRD-WRK-025 medium QC C
11 WRD-WRK-031 medium QC C
12 WRD-WRK-021 medium Select all that apply B, C, D
13 WRD-WRK-028 medium Select all that apply A, B, D
14 WRD-WRK-055 medium Numeric Entry 5
15 WRD-WRK-020 hard MCQ B
16 WRD-WRK-037 hard MCQ B
17 WRD-WRK-042 hard MCQ B
18 WRD-WRK-045 hard MCQ C
19 WRD-WRK-047 hard MCQ B
20 WRD-WRK-048 hard QC D
21 WRD-WRK-052 hard QC C
22 WRD-WRK-041 hard Numeric Entry 15
23 WRD-WRK-049 hard Numeric Entry 72
24 WRD-WRK-053 hard Numeric Entry 6
25 WRD-WRK-046 hard Select all that apply A, B, D
26 WRD-WRK-051 hard Select all that apply A, C, D
27 WRD-WRK-054 hard MCQ D
28 WRD-WRK-057 hard MCQ D
29 WRD-WRK-059 hard Select all that apply B, C, D
30 WRD-WRK-060 hard QC B

Part C — Worked Solutions

Q1 · WRD-WRK-001 — Answer: B

Step 1 — use least common multiple units so no fractions appear. Let the job = the least common multiple of 6 and 4 = 12 units. Step 2 — A does 12/6 = 2 units per hour. B does 12/4 = 3 units per hour. Step 3 — rates add: together they do 2 + 3 = 5 units per hour. Step 4 — time = 12/5 = 2.4 hours = 2 hours 24 minutes. Shortcut: for two workers, time = ab/(a + b) = (6 x 4)/(6 + 4) = 24/10 = 2.4 hours. Check against the story: in 2.4 hours A does 2.4/6 = 0.4 of the job and B does 2.4/4 = 0.6 of the job, and 0.4 + 0.6 = 1 whole job. Correct. Answer: B.

Trap. Adding the two times, 6 + 4 = 10, gives choice E. Times never add; only rates do. Averaging the times, (6 + 4)/2 = 5, gives choice D. Both fail the bound test: two workers must finish faster than the faster one alone, so the answer has to be under 4 hours. Choice C, 4 hours, is simply B's solo time, the answer to 'how fast is the faster machine' - help can only make the job quicker than 4 hours, never exactly 4. Choice A, 25 minutes, comes from inverting the shortcut the wrong way as (a + b)/ab = 10/24 hour.

Q2 · WRD-WRK-005 — Answer: C

Step 1 — let the cistern = the least common multiple of 4 and 12 = 12 units. Step 2 — the pipe adds 12/4 = 3 units per hour. The drain removes 12/12 = 1 unit per hour, so its rate is -1. Step 3 — a drain opposes the fill, so subtract: net rate = 3 - 1 = 2 units per hour. Step 4 — time = 12/2 = 6 hours. Check against the story: in 6 hours the pipe pours in 6/4 = 1.5 cisterns' worth and the drain removes 6/12 = 0.5 of a cistern, leaving exactly 1 cistern full. Correct. Answer: C.

Trap. Treating the drain as a second filler and adding the rates, 1/4 + 1/12 = 1/3, gives 3 hours, choice A. The drain's rate is negative and must be subtracted. Choice B, 4 hours, ignores the drain altogether and reports the pipe's own filling time; a drain can only make the fill take longer. Averaging the times, (4 + 12)/2 = 8, gives choice D, and adding them, 4 + 12 = 16, gives choice E.

Q3 · WRD-WRK-003 — Answer: 4

Step 1 — let the tank = the least common multiple of 12 and 6 = 12 units. Step 2 — A delivers 12/12 = 1 unit per hour; B delivers 12/6 = 2 units per hour. Step 3 — rates add: 1 + 2 = 3 units per hour. Step 4 — time = 12/3 = 4 hours. Check against the story: in 4 hours A fills 4/12 = 1/3 of the tank and B fills 4/6 = 2/3, and 1/3 + 2/3 = 1 full tank. Correct. Answer: 4.

Trap. Adding the times, 12 + 6 = 18, or averaging them to get 9. Neither can be right: together must beat B's own 6 hours, so any answer of 6 or more is impossible on sight.

Q4 · WRD-WRK-014 — Answer: 6

Step 1 — combined rate = 1/4 of the report per hour. A's rate = 1/12 per hour. Step 2 — rates add, so B's rate = combined rate - A's rate = 1/4 - 1/12. Step 3 — 1/4 = 3/12, so 3/12 - 1/12 = 2/12 = 1/6 per hour. Step 4 — B alone takes 1/(1/6) = 6 hours. Check against the story: in 4 hours A prints 4/12 = 1/3 of the report and B prints 4/6 = 2/3, and 1/3 + 2/3 = 1 whole report. Correct. Answer: 6.

Trap. Subtracting the times, 12 - 4 = 8, and answering 8. Times do not subtract any more than they add; the subtraction happens at the level of rates. Testing 8 exposes it: 1/12 + 1/8 = 5/24, which is a combined time of 24/5 = 4.8 hours, not 4.

Q5 · WRD-WRK-007 — Answer: C

Step 1 — let the job = the least common multiple of 10 and 15 = 30 units. Step 2 — A does 30/10 = 3 units per hour; B does 30/15 = 2 units per hour. Step 3 — together they do 3 + 2 = 5 units per hour, so the time is 30/5 = 6 hours. Step 4 — Quantity A = 6 and Quantity B = 6, so the two quantities are equal. Check against the story: in 6 hours A finishes 6/10 = 3/5 of the job and B finishes 6/15 = 2/5, and 3/5 + 2/5 = 1 whole job. Correct. Answer: C.

Trap. Averaging the times gives (10 + 15)/2 = 12.5 hours, which makes Quantity A look larger and points to choice A. That answer is impossible before any arithmetic: two workers together must beat A's own 10 hours, so Quantity A must be below 10.

Q6 · WRD-WRK-016 — Answer: B

Step 1 — let the project = the least common multiple of 9 and 6 = 18 units. A does 2 units per hour; B does 3 units per hour. Step 2 — A alone for 3 hours does 3 x 2 = 6 units. Step 3 — remaining work = 18 - 6 = 12 units. Step 4 — once B joins the pair does 2 + 3 = 5 units per hour. Step 5 — time after B joins = 12/5 = 2.4 hours = 2 hours 24 minutes. Check against the story: A works 3 + 2.4 = 5.4 hours at 2 units per hour = 10.8 units; B works 2.4 hours at 3 units per hour = 7.2 units; 10.8 + 7.2 = 18 units, the whole project. Correct. Answer: B.

Trap. Forgetting to subtract the head start and dividing the whole job by the combined rate, 18/5 = 3.6 hours, which is choice D. The question asks only for the time after B joins, and 3 hours of work is already banked. Choice E, 6 hours, comes from taking the remaining 12 units at A's own rate of 2 units per hour, 12/2 = 6, as if B never arrived. Choice A, 2 hours, divides the remaining 12 units by 6, B's solo TIME, instead of by the combined 5 units per hour. Choice C, 3 hours, subtracts the 3 elapsed hours from the 18 units to get 15 and divides that by 5; hours and units cannot be subtracted from each other.

Q7 · WRD-WRK-026 — Answer: A

Step 1 — B takes 40 percent longer than 10 hours: 10 x 1.4 = 14 hours. Step 2 — A's rate = 1/10 per hour; B's rate = 1/14 per hour. Step 3 — combined rate = 1/10 + 1/14. Using denominator 70: 7/70 + 5/70 = 12/70 = 6/35 per hour. Step 4 — time = 35/6 hours = 5 5/6 hours = 5 hours 50 minutes. Shortcut: ab/(a + b) = (10 x 14)/24 = 140/24 = 35/6. Check against the story: in 35/6 hours A writes (35/6)/10 = 7/12 of the report and B writes (35/6)/14 = 5/12, and 7/12 + 5/12 = 1 whole report. Correct. Answer: A.

Trap. Reading '40 percent longer' as '40 percent as fast' and setting B's rate at 0.4 x (1/10) = 1/25, which gives (10 x 25)/35 = 50/7 hours, or 7 hours 9 minutes to the nearest minute, choice C. A separate error takes B's time as 14 and then averages the times, (10 + 14)/2 = 12, choice E. Choice B, 6 hours, reads the numerator of the combined rate 6/35 per hour as a count of hours, and choice D, 8 hours 24 minutes, is 60 percent of 14 hours - a percentage applied to B's time rather than to A's.

Q8 · WRD-WRK-034 — Answer: C

Step 1 — measure the job in worker-days: 10 workers x 20 days = 200 worker-days. Step 2 — the first 5 days use 10 x 5 = 50 worker-days. Step 3 — remaining work = 200 - 50 = 150 worker-days. Step 4 — 6 workers remain, so the days needed = 150/6 = 25. Check against the story: 50 worker-days done plus 6 x 25 = 150 worker-days gives 200, the full job, and the project runs 5 + 25 = 30 days in total instead of 20. Correct. Answer: C.

Trap. Answering 30, choice D, which is the TOTAL elapsed time from day zero rather than the additional days asked for. Choice A, 15 days, divides the remaining 150 worker-days by the original 10 workers instead of the 6 who stay. Choice B, 20 days, is the original schedule copied back, as if the departures cost nothing. Choice E, 35 days, finds the correct 30-day total and then adds the 5 days already worked a second time.

Q9 · WRD-WRK-023 — Answer: 18

Step 1 — combined rate of all three = 1/3 of the house per hour. Step 2 — first friend's rate = 1/6; second friend's rate = 1/9. Step 3 — third friend's rate = 1/3 - 1/6 - 1/9. Using denominator 18: 6/18 - 3/18 - 2/18 = 1/18 per hour. Step 4 — third friend alone takes 1/(1/18) = 18 hours. Check against the story: in 3 hours the three do 3/6 + 3/9 + 3/18 = 1/2 + 1/3 + 1/6 = 1 whole house. Correct. Answer: 18.

Trap. Subtracting times instead of rates: 6 + 9 = 15, then 15 - 3 = 12, or 9 - 6 - 3 = 0. Only rates are additive. A third friend at 12 hours would give 1/6 + 1/9 + 1/12 = 13/36 per hour, a combined time of 36/13 = 2.77 hours, not 3.

Q10 · WRD-WRK-025 — Answer: C

Step 1 — rates add: 1/n + 1/(2n) = 2/(2n) + 1/(2n) = 3/(2n) jobs per hour. Step 2 — time = 1/(combined rate) = 2n/3 hours. Step 3 — Quantity A = 2n/3, which is exactly Quantity B, for every n > 0. Check against the story with n = 6: A takes 6 hours, B takes 12 hours, together (6 x 12)/18 = 4 hours, and 2n/3 = 12/3 = 4. Correct. Answer: C.

Trap. Choosing D because n is unknown. The n cancels: the answer is the same algebraic expression for every positive n, so the relationship is fully determined. The other live error inverts once too often, reporting the combined RATE 3/(2n) as if it were the time, which makes Quantity B look larger and points to B.

Q11 · WRD-WRK-031 — Answer: C

Step 1 — let the total time be T hours. B works all T hours; A works T - 2 hours. Step 2 — the two contributions must sum to one whole job: (T - 2)/8 + T/12 = 1. Step 3 — multiply through by 24: 3(T - 2) + 2T = 24. Step 4 — 3T - 6 + 2T = 24, so 5T = 30 and T = 6. Step 5 — Quantity A = 6 hours = Quantity B. Check against the story: A works 4 hours and does 4/8 = 1/2 the job; B works 6 hours and does 6/12 = 1/2 the job; the halves sum to one job and A did indeed stop 2 hours early. Correct. Answer: C.

Trap. Computing the together-time first, (8 x 12)/20 = 4.8 hours, and then adding the 2 solo hours to get 6.8, which makes Quantity A look larger and points to choice A. The 2 hours are not extra time bolted on; they are the tail of the job during which only B is working, and the whole schedule must be solved as one equation.

Q12 · WRD-WRK-021 — Answer: B, C, D

Combined rate = 1/12 + 1/8 = 2/24 + 3/24 = 5/24 of the task per hour, so together they take 24/5 = 4.8 hours. A. False. 4.8 hours is not less than 4 hours. The bound is that the pair beats B's 8 hours, not that they beat half of it. B. True. The rate is the 5/24 computed above and 0.8 hour = 48 minutes, so 4.8 hours is 4 hours 48 minutes. C. True. A alone for 3 hours does 3/12 = 1/4 of the task, leaving 3/4. At the combined rate that takes (3/4)/(5/24) = (3/4)(24/5) = 18/5 = 3.6 hours = 3 hours 36 minutes, so the finish is at 3 + 3.6 = 6.6 hours = 6 hours 36 minutes. D. True. B's rate 1/8 exceeds A's rate 1/12 and both work the same 4.8 hours, so B does 4.8/8 = 3/5 of the task against A's 4.8/12 = 2/5. E. False. A's rate is 1/12 = 2/24 per hour, not 3/24; 3/24 = 1/8 is B's rate. Check against the story: in 4.8 hours A does 2/5 and B does 3/5, and 2/5 + 3/5 = 1 whole task; in the option C scenario A works 6.6 hours for 6.6/12 = 11/20 and B works 3.6 hours for 3.6/8 = 9/20, and 11/20 + 9/20 = 1. Correct. Answer: B, C and D.

Trap. Option A is the 'halve the faster time' error: students remember that the pair beats 8 hours and guess the answer is under 4. The true bound is between 4 and 8. Option C tempts the opposite slip - reporting 3 hours 36 minutes, the length of the shared stretch, rather than the 6 hours 36 minutes measured from A's start - and also catches anyone who divides the WHOLE task by the combined rate after the head start. Option E swaps the two rates, assigning B's 1/8 to A; the tell is that the slower worker cannot have the larger rate.

Q13 · WRD-WRK-028 — Answer: A, B, D

Net rate = 1/9 - 1/18. Using denominator 18: 2/18 - 1/18 = 1/18 of the tank per hour. A. True. That is the computation above; the drain is subtracted from the inlet, not added to it. B. True. Time = 1/(1/18) = 18 hours. C. False. After 6 hours the tank holds 6 x 1/18 = 1/3, not 2/3. D. True. Two stages: A alone for 3 hours puts in 3 x 1/9 = 1/3 of a tank, and the remaining 2/3 at the net rate 1/18 takes (2/3)(18) = 12 hours, so the tank is full at 3 + 12 = 15 hours. That is 18 - 15 = 3 hours sooner. E. False. Then the net rate would be 1/9 - 1/6 = 2/18 - 3/18 = -1/18, a net emptying. The tank would never fill at all. Check against the story: in 18 hours pipe A pours in 18/9 = 2 tanks' worth while pipe B removes 18/18 = 1 tank's worth, leaving exactly 1 tank. Correct. Answer: A, B and D.

Trap. Option C catches students who read 1/3 filled and report the 2/3 that is still empty. Option E catches the student who subtracts the times, 9 and 6, or who assumes any drain slower than the tank's total volume still lets it fill; once the drain rate exceeds the fill rate the level never rises. Option D catches the student who prices the head start at the whole difference between the two fill times, 18 - 9 = 9 hours, as if B stayed shut all the way; B is closed for 3 hours only, and the saving is 3 hours.

Q14 · WRD-WRK-055 — Answer: 5

Step 1 — day d supplies d workers x 8 hours = 8d worker-hours. Step 2 — the cumulative total through day d is 8(1 + 2 + ... + d) = 8 x d(d + 1)/2 = 4d(d + 1). Step 3 — set 4d(d + 1) against 120: this asks for d(d + 1) = 30. Step 4 — d = 4 gives 4 x 5 = 20, so 4 x 20 = 80 worker-hours, short of 120. Step 5 — d = 5 gives 5 x 6 = 30, so 4 x 30 = 120 worker-hours, exactly the project. Step 6 — the project is first completed on day 5. Check against the story: the daily amounts are 8, 16, 24, 32 and 40 worker-hours, and 8 + 16 + 24 + 32 + 40 = 120. Correct. Answer: 5.

Trap. Dividing 120 by the day-1 staffing, 120/8 = 15, and answering 15, which ignores that the crew grows every day. The other error treats the crew as fixed at some average size, for instance 120/(3 x 8) = 5 by luck or 120/(5 x 8) = 3; the staffing is a running total, so the cumulative work is triangular, not linear.

Q15 · WRD-WRK-020 — Answer: B

Let t be the total time in hours. Ana paints for t hours and Ben for t - 1 hours. Ana paints 1/6 of the room per hour and Ben 1/4 per hour. t/6 + (t - 1)/4 = 1. Multiply by 12: 2t + 3(t - 1) = 12, so 5t = 15 and t = 3. Check: Ana paints 3/6 = 1/2 and Ben paints 2/4 = 1/2. Answer: B.

Trap. Finding the time with no break, 1/(1/6 + 1/4) = 2.4 hours, and adding the full hour to get 3.4 (choice C). Ana keeps painting during the break, so the job is delayed by less than an hour.

Q16 · WRD-WRK-037 — Answer: B

Step 1 — the tank needs 1 - 3/4 = 1/4 of its volume. Step 2 — phase 1 net rate = 1/8 - 1/24 = 3/24 - 1/24 = 2/24 = 1/12 of the tank per hour. Step 3 — in 2 hours phase 1 adds 2 x 1/12 = 1/6 of the tank. Step 4 — still needed: 1/4 - 1/6 = 3/12 - 2/12 = 1/12 of the tank. Step 5 — phase 2 runs at the inlet rate alone, 1/8 per hour, so it lasts (1/12)/(1/8) = 8/12 = 2/3 hour = 40 minutes. Step 6 — total = 2 hours + 40 minutes = 2 hours 40 minutes. Check against the story: the tank goes 3/4 -> 3/4 + 1/6 = 11/12 after 2 hours, then 11/12 + (2/3)(1/8) = 11/12 + 1/12 = 1. Full. Correct. Answer: B.

Trap. Choice A, 2 hours, assumes the tank is full at the moment the drain is closed, but after 2 hours it stands at 11/12. Choice C, 3 hours, is the answer to the easier question the stem no longer asks: filling the last 1/4 entirely at the net rate 1/12 ignores the drain being closed. Choice E, 6 hours, is (3/4)/(1/8): it times the three quarters ALREADY in the tank at the inlet rate alone, as though that water still had to be poured in, when only the missing 1/4 does. Choice D, 3 hours 20 minutes, adds the phase-2 length to the wrong phase-1 length of 2 hours 40 minutes.

Q17 · WRD-WRK-042 — Answer: B

Step 1 — set C's rate to r jobs per hour. Then B's rate = 2r and A's rate = 3 x 2r = 6r. Step 2 — combined rate of all three = 6r + 2r + r = 9r. Step 3 — the three finish in 4 hours, so 9r = 1/4, giving r = 1/36. Step 4 — A and B together work at 6r + 2r = 8r = 8/36 = 2/9 of the job per hour. Step 5 — time = 1/(2/9) = 9/2 = 4.5 hours = 4 hours 30 minutes. Shortcut: dropping C removes 1 of the 9 rate units, so the time scales by 9/8: 4 x 9/8 = 4.5 hours. Check against the story: A 6/36, B 2/36, C 1/36 per hour; A and B give 8/36 = 2/9, and 4.5 x 2/9 = 1 whole job. All three give 9/36 = 1/4, which is 4 hours. Correct. Answer: B.

Trap. Scaling the time the wrong way: dropping a worker must make the job take LONGER than 4 hours, but multiplying by 8/9 instead of 9/8 gives 32/9 = 3 hours 33 minutes, choice A, which fails that bound. Choice C, 6 hours, is A's solo time, 1/(6r) - stopping one step early. Choice D, 7 hours 12 minutes, chains the multipliers on TIMES rather than rates: reading 'A is 3 times as fast' as A taking 3 times as long makes C 6 hours, B 12 and A 18, and (18 x 12)/30 = 7.2 hours. Choice E, 9 hours, reads the 9 in the combined rate 9r as a number of hours.

Q18 · WRD-WRK-045 — Answer: C

Step 1 — hour 1, all three: 1/4 + 1/6 + 1/12 = 3/12 + 2/12 + 1/12 = 6/12 = 1/2 of the job. Step 2 — hour 2, A and B only: 1/4 + 1/6 = 3/12 + 2/12 = 5/12 of the job. Step 3 — done after 2 hours = 1/2 + 5/12 = 6/12 + 5/12 = 11/12. Remaining = 1/12. Step 4 — A alone works at 1/4 per hour, so the time is (1/12)/(1/4) = 4/12 = 1/3 hour. Step 5 — 1/3 hour = 20 minutes. Check against the story: A works 2 1/3 hours for (7/3)(1/4) = 7/12; B works 2 hours for 2/6 = 4/12; C works 1 hour for 1/12; 7/12 + 4/12 + 1/12 = 1 whole job. Correct. Answer: C.

Trap. Finishing the leftover at B's rate instead of A's: after 2 hours 11/12 of the job is done, and taking the last 1/12 at B's 1/6 per hour gives 1/2 hour, choice D. A is the one still working, so the closing rate is A's 1/4 per hour and the leftover takes 1/3 hour. Choice A, 10 minutes, applies the three-worker rate 1/2 to the leftover, as if nobody had left. Choice B, 15 minutes, reads the 1/4 in 'A works at 1/4 of a job per hour' as a quarter of an hour. Choice E, 40 minutes, drops C from hour 1 altogether: A and B alone for both hours leave 1/6 of the job, and 1/6 divided by 1/4 is 2/3 hour.

Q19 · WRD-WRK-047 — Answer: B

With k machines the job takes 60/k hours. 60/(n - 1) - 60/n = 5. Test the choices: n = 4 gives 60/3 - 60/4 = 20 - 15 = 5. This works. n = 3 gives 30 - 20 = 10 and n = 5 gives 15 - 12 = 3, so no other choice works. Algebra: 60n - 60(n - 1) = 5n(n - 1), so n(n - 1) = 12 and n = 4. Answer: B.

Trap. Solving n(n - 1) = 12 and reporting n - 1 = 3 (choice A), the smaller number of machines. The question defines n as the larger number.

Q20 · WRD-WRK-048 — Answer: D

Step 1 — the only constraint is 1/a + 1/b = 1/6 with 0 < a < b. Solve for b: 1/b = 1/6 - 1/a = (a - 6)/(6a), so b = 6a/(a - 6). Step 2 — a < b forces a < 12, and b > 0 forces a > 6, so a ranges over 6 < a < 12 and every such a gives a legal pair. Step 3 — take a = 9: b = 54/3 = 18, and b - a = 9, which is greater than 5. Step 4 — take a = 10: b = 60/4 = 15, and b - a = 5, which equals Quantity B. Step 5 — take a = 11: b = 66/5 = 13.2, and b - a = 2.2, which is less than 5. Step 6 — all three pairs satisfy the stem, and they give all three orderings, so the relationship is not determined. Check against the story: 1/9 + 1/18 = 2/18 + 1/18 = 1/6; 1/10 + 1/15 = 3/30 + 2/30 = 1/6; 1/11 + 5/66 = 6/66 + 5/66 = 11/66 = 1/6. Every pair really does finish in 6 hours. Correct. Answer: D.

Trap. Locking onto the single memorable pair a = 10, b = 15 - the one that makes 1/6 fall out cleanly - and answering C because b - a is exactly 5 there. One legal pair proves nothing in a QC; the gap b - a is free to move because a can sit anywhere strictly between 6 and 12, and it runs from just above 0 (a near 12) to arbitrarily large (a just above 6). Choosing A on the grounds that b must be much larger than a ignores the a = 11 case, where the two solo times are only 2.2 hours apart.

Q21 · WRD-WRK-052 — Answer: C

Step 1 — net rate = 1/3 - 1/5 = 5/15 - 3/15 = 2/15 of the pool per hour. Step 2 — the net rate is positive, so the level rises steadily until the pool is full. Step 3 — the pool reaches capacity at 1/(2/15) = 15/2 = 7.5 hours. Step 4 — 14 hours is well past 7.5 hours, so the pool has been full for 6.5 hours. Step 5 — the level cannot pass 1: the excess overflows. The fraction filled at 14 hours is exactly 1. Step 6 — Quantity A = 1 = Quantity B. Check against the story: 14 x 2/15 = 28/15, which is about 1.87 pools' worth of net inflow; the first 15/15 fills the pool and the remaining 13/15 runs over the edge. Correct. Answer: C.

Trap. Carrying the net rate straight past the 7.5-hour mark: 14 x 2/15 = 28/15, which is greater than 1, and concluding that Quantity A is greater, choice A. A pool cannot be 1.87 pools full - the cap is what the overflow sentence is for. Adding the rates as if B also filled, 1/3 + 1/5 = 8/15, fills the pool in 15/8 hours and gets to C by an accident of arithmetic. Choice B would require the pool to be under capacity at 14 hours, which needs the net rate to be negative; here A is the faster pipe, so the level rises.

Q22 · WRD-WRK-041 — Answer: 15

Step 1 — phase 1 rate, A and B only: 1/9 + 1/18 = 2/18 + 1/18 = 3/18 = 1/6 of the tank per hour. Step 2 — in 3 hours phase 1 fills 3 x 1/6 = 1/2 of the tank. Step 3 — remaining = 1 - 1/2 = 1/2 of the tank. Step 4 — phase 2 rate, with C draining: 1/6 - 1/8. Using denominator 24: 4/24 - 3/24 = 1/24 of the tank per hour. Step 5 — phase 2 lasts (1/2)/(1/24) = 24/2 = 12 hours. Step 6 — total = 3 + 12 = 15 hours. Check against the story: A runs 15 hours for 15/9 = 5/3 tanks, B runs 15 hours for 15/18 = 5/6 of a tank, C runs 12 hours and removes 12/8 = 3/2 tanks; 5/3 + 5/6 - 3/2 = 10/6 + 5/6 - 9/6 = 1 tank exactly. Correct. Answer: 15.

Trap. Answering 12, the length of phase 2 alone, and forgetting the 3 hours already elapsed. The deeper trap is adding C's rate instead of subtracting it, which gives a phase-2 rate of 1/6 + 1/8 = 7/24 and a total of 3 + 12/7, under 5 hours - faster than with no drain at all, which is impossible. A third error stops at phase 1 and answers 6, the time A and B alone would have needed for the whole tank.

Q23 · WRD-WRK-049 — Answer: 72

Step 1 — rates add: 1/a + 1/b = 1/4. Step 2 — combine the left side over a common denominator: (b + a)/(ab) = 1/4. Step 3 — substitute a + b = 18: 18/(ab) = 1/4. Step 4 — cross-multiply: ab = 72. This is the two-worker shortcut in reverse: together-time = ab/(a + b), so 4 = ab/18 gives ab = 72 in one line, with no need to find a and b separately. Check against the story: a and b are the roots of x^2 - 18x + 72 = 0, which factors as (x - 6)(x - 12), so a and b are 6 and 12. Then 1/6 + 1/12 = 2/12 + 1/12 = 3/12 = 1/4 per hour, which is 4 hours together, and 6 + 12 = 18. Correct. Answer: 72.

Trap. Solving the quadratic to get a = 6 and b = 12 and then answering 18 (the sum, already given) or 6 or 12 instead of the product. The other error is writing 1/a + 1/b = 1/(a + b), which would make the together-time 18 hours - longer than either worker alone, an impossibility.

Q24 · WRD-WRK-053 — Answer: 6

Step 1 — rates add: 1/n + 1/(n + 6) = 1/4. Step 2 — combine the left side: (n + 6 + n)/(n(n + 6)) = (2n + 6)/(n^2 + 6n) = 1/4. Step 3 — cross-multiply: 4(2n + 6) = n^2 + 6n, so 8n + 24 = n^2 + 6n. Step 4 — rearrange: n^2 - 2n - 24 = 0. Step 5 — factor: (n - 6)(n + 4) = 0, so n = 6 or n = -4. Only n = 6 is a positive integer. Check against the story: A takes 6 hours, B takes 12 hours, and 1/6 + 1/12 = 3/12 = 1/4 per hour, which is 4 hours together. Correct. Answer: 6.

Trap. Averaging the two times and setting (n + (n + 6))/2 = 4, which gives n = 1 - a worker who finishes in 1 hour yet supposedly needs 4 hours with help. Accepting the second root n = -4 is the other error; the stem restricts n to positive integers, and a negative time is meaningless.

Q25 · WRD-WRK-046 — Answer: A, B, D

Let the job be 1 unit. Combined rate = 1/T. A's rate = 1/(2T). So B's rate = 1/T - 1/(2T) = 2/(2T) - 1/(2T) = 1/(2T): the two workers are identical. A. True. B's rate is 1/(2T), so B alone takes 2T hours. B. True. A alone for T hours does T x 1/(2T) = 1/2 of the job. B then needs (1/2)/(1/(2T)) = T hours for the rest, so the job is done at T + T = 2T hours. C. False. The two rates are equal, so neither is greater. D. True. Twice A's rate is 2 x 1/(2T) = 1/T, which is the combined rate. E. False. Three workers at 1/(2T) each give 3/(2T) per hour, so the job takes 2T/3 hours, not T/2. Halving T would need four such workers. Check against the story with T = 5: A takes 10 hours, B takes 10 hours, 1/10 + 1/10 = 1/5 gives 5 hours together; A alone for 5 hours does half and B needs 5 more, a total of 10 = 2T; and three of them do 3/10 per hour, finishing in 10/3 = 2T/3 hours. Correct. Answer: A, B and D.

Trap. Assuming B must be the faster worker because the pair halves A's solo time, which makes C look true. The halving is exactly what an IDENTICAL partner produces: doubling the rate halves the time. Any partner faster than A would push the together-time below T. Option E is the parallel error on the other side - adding a third identical worker multiplies the rate by 3/2, not by 2, so the time falls to 2T/3 and not to T/2. Option B is true but must be computed in two stages, not guessed from the symmetry.

Q26 · WRD-WRK-051 — Answer: A, C, D

Combined rate = 1/20 + 1/30 = 3/60 + 2/60 = 5/60 = 1/12 of the job per hour, so after t hours the fraction done is t/12 and the fraction remaining is 1 - t/12. The job finishes at t = 12. A. True. 1 - 8/12 = 4/12 = 1/3 exactly. B. False. 1 - 9/12 = 1/4 exactly, which is not LESS than 1/4. C. True. 6/12 = 1/2 exactly. D. True. 10/12 = 5/6, and 5/6 = 10/12 is greater than 3/4 = 9/12. E. False. The pair needs the full 12 hours; at 11 hours 1/12 of the job is still left. Check against the story: in 12 hours A does 12/20 = 3/5 and B does 12/30 = 2/5, and 3/5 + 2/5 = 1 whole job. Correct. Answer: A, C and D.

Trap. Option B is the strict-inequality trap: 9 hours leaves exactly a quarter, and 'less than 1/4' excludes it - the same reason D survives, since 5/6 clears 3/4 with room to spare. Option E catches the student who reads the 10-hour progress of 5/6 as 'nearly done' and rounds the finish forward. The structural error is adding the times, 20 + 30 = 50, or averaging them to 25; either puts the finish far past every listed hour and makes all five statements look false.

Q27 · WRD-WRK-054 — Answer: D

Step 1 — work done in one full three-day cycle = 1/10 + 1/15 + 1/30 = 3/30 + 2/30 + 1/30 = 6/30 = 1/5 of the job. Step 2 — four complete cycles cover 12 days and 4 x 1/5 = 4/5 of the job, leaving 1/5. Step 3 — do not divide the leftover by a cycle average; walk the days one at a time, because each day carries a different rate. Step 4 — day 13 is A's day at 1/10 = 3/30, taking the total to 24/30 + 3/30 = 27/30. Remaining 3/30. Step 5 — day 14 is B's day at 1/15 = 2/30, taking the total to 29/30. Remaining 1/30. Step 6 — day 15 is C's day at exactly 1/30, which clears the last 1/30. The job is first completed on day 15. Check against the story: over 15 days A works 5 days, B works 5 days and C works 5 days, giving 5/10 + 5/15 + 5/30 = 15/30 + 10/30 + 5/30 = 1 whole job. Correct. Answer: D.

Trap. Choice B, day 13, comes from clearing the leftover 1/5 in a single day at the CYCLE rate 1/5, when day 13 belongs to A alone at only 1/10. Choice C, day 14, is where the running total reaches 29/30 and students round it up to a finished job. Choice A, day 10, ignores the rotation and applies A's rate 1/10 to every day. Choice E, day 16, is an off-by-one after correctly finding that five cycles are needed: five cycles end ON day 15, not after it.

Q28 · WRD-WRK-057 — Answer: D

Let a and b be the fractions of the job that A and B complete per hour. Together: a + b = 1/6. With A doubled: 2a + b = 1/4.5 = 2/9. Subtract the first equation from the second: a = 2/9 - 1/6 = 4/18 - 3/18 = 1/18. Machine A alone takes 18 hours. Check: b = 1/6 - 1/18 = 1/9. Then 2/18 + 1/9 = 2/9, and 1 / (2/9) = 4.5 hours. Answer: D.

Trap. Solving for machine B instead: b = 1/9, so 9 hours (choice A). A second error is adding the two times, 6 + 4.5 = 10.5 (choice B); times of machines working together are combined through rates, never added.

Q29 · WRD-WRK-059 — Answer: B, C, D

Fastest case: pump B never stops. Combined rate = 1/3 + 1/6 = 1/2 tank per hour, so the tank fills in 2 hours. Slowest case: pump B is turned off immediately. Pump A alone takes 3 hours. Turning B off at some time in between gives every time from 2 to 3 hours. A: 1.5 is less than 2. Not possible. B: 2. Possible. C: 2.5. Possible (B runs for 1 hour: A fills 2.5/3 = 5/6 and B fills 1/6). D: 3. Possible. E: 3.6 is more than 3. Not possible, because pump A alone needs only 3 hours. Answer: B, C, D.

Trap. Excluding 2 and 3 because the stem says pump B 'may be turned off'. The stem allows B to run the whole time and allows it to be turned off immediately, so both end values are possible. Selecting 1.5 comes from halving pump A's time as though B were as fast as A.

Q30 · WRD-WRK-060 — Answer: B

Step 1 — let x be the hourly rate of one X machine and y the hourly rate of one Y machine, each as a fraction of the job. Step 2 — the two crews give 3x + 5y = 1/8 and 5x + 3y = 1/6. Step 3 — the insight: (3, 5) + (5, 3) = (8, 8), which is exactly twice the target crew (4, 4). Add the two equations instead of solving them separately. Step 4 — 8x + 8y = 1/8 + 1/6 = 3/24 + 4/24 = 7/24. Step 5 — halve both sides: 4x + 4y = 7/48 of the job per hour. Step 6 — time = 48/7 = 6 6/7 hours, which is less than 7, so Quantity B is greater. Check against the story: solving in full gives x = 11/384 and y = 3/384, so 3x + 5y = 33/384 + 15/384 = 48/384 = 1/8 and 5x + 3y = 55/384 + 9/384 = 64/384 = 1/6, both as stated, and 4x + 4y = 44/384 + 12/384 = 56/384 = 7/48. Correct. Answer: B.

Trap. Averaging the two given times, (8 + 6)/2 = 7, lands exactly on Quantity B and gives choice C. Times never average; rates do, and the average of the rates 1/8 and 1/6 is 7/48 per hour, whose reciprocal 48/7 is below 7. Solving for x and then timing four X machines alone, 4x = 44/384 = 11/96 per hour, gives 96/11 = 8 8/11 hours, above 7, choice A; that forgets the four Y machines. Choice D tempts because two unknown rates look underdetermined, but the symmetric crew (4, 4) is the average of (3, 5) and (5, 3), so the sum of the two equations settles the comparison without ever finding x and y.